Pune Ring Road – Complete Route, Map, Construction Details & Connectivity

What is the Pune Ring Road?

The Pune Ring Road is a large-scale circumferential highway planned to encircle Pune city and the Pimpri-Chinchwad region. It’s designed as a controlled-access, multi-lane expressway to divert through traffic away from the city core, reduce travel time, and connect major radial highways around Pune. Two related schemes exist in parallel: the Outer Ring Road (implemented by MSRDC) and the Inner/Intermediate Ring alignments handled by PMRDA for metropolitan planning.


Route & Map — the essentials

  • Approximate length: ~136–172 km (varies by alignment and source — outer ring definitions differ from inner ring routes).
  • General alignment: A circumferential loop touching Alandi (north), Chimbli/Lonand area (north-east), Kondhva/Sivapur (south), Pirangut/Khed Shivapur (west) and back to Alandi — effectively encircling Pune and touching major entry/exit highways. The alignment passes through multiple talukas (Khed, Haveli, Mulshi, Maval, Bhor) and several villages.
  • Key interchanges & connections: Designed to connect to Mumbai-Pune Expressway, Pune-Satara (NH-48), Pune-Nashik corridors, Pune-Ahmednagar roads and several state highways — enabling bypass options for long-haul truck traffic.

(Official downloadable maps and alignment PDFs are available on PMRDA/MSRDC portals for precise CH (chainage) points and village-level alignment.)


Phasing & Project Components

The project is delivered in parts by different agencies:

  1. MSRDC Outer Ring Road — large outer bypass segments, main expressway sections, major BOT/EPC packages.
  2. PMRDA Inner/Intermediate Ring sections — urban bypasses, interchanges, flyovers and connection ramps closer to the metropolitan area. These emphasize integration with city planning and town-planning schemes.
  3. Environmental clearances & utility works — certain eastern alignment parts have detailed EC (environmental clearance) documents and village-wise impacts, suggesting environmental mitigation measures are planned.

Cost, Contractor & Timeline (status snapshot)

  • Estimated cost band: Multiple reports cite a multi-thousand crore programme — some segments individually cost several hundred to a few thousand crores depending on terrain and structures. One commonly referenced aggregate figure in media coverage for large phases is in the tens of thousands crores (project-wide).
  • Start & completion: Construction activities have been reported to begin (phased) from 2024–2025 onwards, with some news items projecting completion of major stretches by 2027 for earlier packages. However, timelines are phased and conditional on land clearances and tendering. Recent reporting highlights both kickoff of works and delays in some phases due to land/forest/defence clearances.

Important: timelines change as packages get tendered and land acquisition is completed — always check MSRDC/PMRDA project pages and local news for the latest schedule.


Construction challenges & environmental considerations

  • Land acquisition & stakeholders: Ring roads require significant ROW; several villages and agricultural parcels lie in the alignment. PMRDA and MSRDC have publicly noted consultations with villagers and different compensation mechanisms (TDR/FSI etc.). Resistance or negotiation can affect schedule.
  • Terrain & ecology: Eastern and southern fringes cross hilly and ecologically sensitive patches where environmental clearances (EC) mandate mitigation, compensatory afforestation and design tweaks.
  • Utilities & clearances: Delays often arise from coordination with defence land, forest department, and local administrations — these are common bottlenecks cited in media updates.

What the Ring Road means for connectivity & travel times

  • Decongestion: Heavy through-traffic (trucks and intercity vehicles) will be moved away from city radial roads and inner ring roads, reducing cross-city load.
  • Faster orbital movement: Where implemented, the ring will allow circumnavigational travel around Pune without entering the city, saving both time and fuel for logistics and intercity traffic.
  • Better access to highways: The ring acts as a collector/distributor linking multiple national highways, expressways and state roads — improving last-mile access to logistics parks, industrial zones and airports.

Impact on real estate & investment (practical advice)

  • Peripheral appreciation: Land and development nodes near major interchanges typically see faster appreciation — industrial warehousing, logistics hubs and residential townships often cluster around well-connected interchanges. Assess proximity to planned interchanges rather than raw distance to the ring center.
  • Zoning & town-planning schemes: PMRDA’s town-planning and TP-scheme announcements near inner ring corridors may change FAR/TDR frameworks — monitor these to evaluate development potential and acquisition risks.
  • Short-term vs long-term: Construction activity can temporarily depress land usability (access issues) but historically results in medium-to-long-term uplift once connectivity stabilizes. Factor in project phasing and likely completion order when timing investments.

Final takeaways (actionable)

  • If you’re an investor/developer: track the final alignment and interchange locations from PMRDA/MSRDC; prioritize parcels with direct interchange access.
  • If you’re a commuter/logistics planner: plan routing options that will leverage the ring once operational — expect diversion of through traffic and new freight corridors.
  • If you’re monitoring risk: watch land acquisition notices, EC clauses, and defence/forest clearances — these most commonly affect schedule and alignment changes.

Sources / Further reading


Quick FAQ

Q: Who is implementing the Pune Ring Road?
A: Multiple agencies — MSRDC for major outer ring packages and PMRDA for inner/metro ring links, coordinated with state government.

Q: How long is the ring road?
A: Sources report between ~136 km to ~172 km depending on which alignment/sections are counted (outer vs full program). Check official maps for the specific package you care about.

Q: When will it be complete?
A: Projected phasing suggests major stretches targeted for mid-2020s completion (some news cited 2027 for early packages), but timelines depend on land clearances and tender awards — verify with PMRDA/MSRDC updates.

Read More Blog:

Mumbai–Pune Corridor Is Emerging as India’s Real Estate Goldmine

Real Estate In Pune | Nikhil Mawale

Purandar IT Park Announced! Here’s How It Will Transform Pune Real Estate

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top